Keep the container on private property, a driveway or a fenced job site, and no permit is involved. That is the normal placement in Taunton and the one we recommend.
Taunton is unusual among Massachusetts cities in what it does not require, and we checked rather than assumed. Most Massachusetts cities regulate containers or haulers through the Board of Health, and some do it through zoning or the building department. Taunton does neither.
The city's Board of Health publishes its complete list of what it permits and regulates, sixteen items long, from animals and asbestos through food, housing, pools and septic systems to wells. There is no refuse hauler permit on it and no container permit on it. The License Commission's list covers alcohol, common victuallers, lodging houses, amusement devices and entertainment, with nothing about waste. The Engineering Department's permit list runs to four items and none of them is a container.
So on the published record there is no Taunton container permit and no Taunton hauler license to hold. We will mark the limit of that: the city's ordinances themselves are published through a legal publisher that will not serve a request from outside a browser session, so we have read the departments' own rosters but not the code behind them. We make no claim about what the code may add.
Two things the Board of Health does have, though, matter a great deal on a Taunton job.
The first is asbestos, and it matters more than anything else here for anyone touching an older property. Every contractor carrying out residential or commercial asbestos removal in Taunton must hold an Asbestos Abatement Permit from the City of Taunton Board of Health. On housing stock of this age, pipe lagging, boiler insulation, floor tile, siding shingles and textured coatings are all candidates. That permit, and the survey behind it, sets the date your container is useful. Book the survey first and the container second, not the other way round.
The second is nuisance. The Board of Health investigates all nuisance complaints in the city and defines a nuisance as any issue related to noise, odor, dust, garbage or refuse. So no container permit does not mean no jurisdiction: an overflowing container, one shedding dust across a boundary or one left with rotting material in it is a Board of Health matter here. Keeping it covered and inside its footprint is all that takes.
There is also an Earth Removal Permit from the Engineering Department, which is worth raising early if your project moves soil as well as building debris.
For a container that has to sit in a Taunton street or sidewalk, the right first call is the city's engineering counter at City Hall, and your account manager will make it with you.