A container on private property, in a driveway or inside a job-site boundary, needs no separate placement permit in South Fulton. A container on city property is different: the code requires a lease agreement with the city first, which is unusual wording and a real step rather than a form. Building material in particular may not go onto public property at all unless the building permit designates the spot.
Now the part that matters, and we are going to be straight about it rather than tidy.
South Fulton's waste ordinance opens with an exclusivity clause. The city says it is exclusively responsible for the collection and disposal of all solid waste and bulk waste within the city limits, and makes it mandatory for occupants of premises in the city to use the city's service. On its face that is a wide claim.
In the same chapter, three things pull the other way, and all three point at a private container on a construction site:
- The city expressly says it is not responsible for collecting, hauling or disposing of any solid
- waste originating from professional debris removal services.
- It says it is not responsible for building material from private property before, during or after
- construction, alteration or demolition, and that such material **shall be removed by the owner of the
- property at their expense**.
- It requires that **all construction and demolition contractors provide on-site receptacles, bulk
- containers or detachable containers**, with the number of containers determined by the size and type
- of the job.
The city's commercial permit is written over commercial solid waste, and the code defines that term to exclude construction and demolition waste by name. So there is no permit class for a construction container company to apply for.
Our reading is that a construction container on private ground sits outside the city's own service and outside that permit, and that the code expects contractors to arrange one. But the exclusivity words are wide, and only the city can say how it applies them to construction debris. So we make that call, to the Solid Waste Division or the city manager, before a container goes onto a South Fulton site.
Two points hit a business customer directly. The city tells the owner of a commercial premises to use an approved service provider, and keeps that list at the city clerk's office. And no business license is issued or renewed until the owner names the provider that collects for the business, unless the city manager grants an exception. So settle the ongoing provider question early.
On a site, the city also wants the waste area placed away from upland runoff and away from any watercourse, handling guidance posted, containers checked for leaks and damage, and extra containers during demolition. Those duties run on the owner and developer through the stormwater ordinances.