Private property placement, in a driveway or on a fenced lot, involves no permit. That is the normal placement in Streamwood and the one we recommend.
For village rules we are going to be straight with you rather than confident. The Village of Streamwood's website refused every request we made, on both of its addresses, and it publishes no site map or index we could work from either. Streamwood does not publish its code through any of the legal publishers this industry uses, and we checked all of them rather than assuming. So we make no claim about whether Streamwood requires a street permit for a container, what it costs, or how long it runs. If part of your container has to sit in a village street or sidewalk, the right first call is Streamwood's public works or community development counter, and your account manager will make it with you.
Cook County is a different story, because the county publishes its position fully and we read it.
Cook County's Department of Environment and Sustainability runs a real permitting and reporting system for waste in suburban Cook, and the part that reaches a container company is a reporting duty rather than a license. Haulers, non-residential haulers and transfer stations each owe the county quarterly reports, on four fixed dates: the first quarter by 30 April, the second by 31 July, the third by 31 October and the fourth by 31 January. Everything goes through the county's electronic permit portal, and the county no longer accepts physical checks at all. A check mailed to the department is returned to sender.
So the question to ask any provider working in suburban Cook County is whether they are current on their county reporting. It is a fair question and it has a definite answer. Your account manager will go through our position with you on the call.
One county permit may land on you rather than on us. If your plan is to crush masonry on site rather than haul it away, Cook County requires a temporary reprocessing permit, which it calls a Temporary Rock Crusher Permit, covering the reprocessing, storage, transport and final use of material generated from construction or demolition. The machine needs a separate equipment registration, and if it stays in suburban Cook County beyond a year it needs an annual certificate of operation too. Fees are not refundable and a new application is required if the equipment moves to a location the current permit does not name. On most jobs a container is cheaper and simpler.
Two more county permits sit upstream of a container on a demolition job: Cook County runs its own demolition permitting and its own asbestos abatement permitting, along with a separate registration for asbestos abatement contractors. On an older property those come first and the container comes second.